栖凤楼品茶app,广东桑拿论坛社区论坛,x77760大陆论坛

Industry information The current position:home > Industry information

Emergency plan for disposal of cement pipe mould

Release time:2019-12-24    This article is read :1466 次

cement pipe mould

Emergency plan for disposal of cement pipe mould

1, cement pipe mold headquarters issued an emergency plan to start the command, and specify the command of the scene, the other groups should quickly rushed to the scene.

2, on-site command received instruction command groups according to the degree of risk, the nature of the event, according to the division of labor, should quickly set up the warning area, at the same time the transfer of hazardous areas and the masses of unrelated persons, their good protection measures.

3, cement pipe mold technical guidance group and emergency rescue team should fulfill their respective responsibilities, quickly into the specific emergency task.

4, cement pipe die after the elimination of danger, carefully check the site, equipment and facilities, to ensure that there is not any danger, danger completely ruled out after the report released by the command command, disarmed, logistical support group dealing with the aftermath, the other groups recovered to normal working state.

Emergency plan for disposal of cement pipe mould
Previous:Septic tank mold what effect on the nature!next:Attention to small details can reduce equipment loss

All rights reserved:Tai'an Renhe Machinery Manufacturing Co., Ltd.     鲁ICP备13025187号-2        公示信息

主站蜘蛛池模板: 内丘县| 克拉玛依市| 新田县| 凤台县| 临夏市| 黎平县| 南投市| 宝丰县| 连江县| 玉门市| 无棣县| 建始县| 和田市| 长宁区| 桂阳县| 平江县| 巴东县| 河津市| 阿拉善盟| 滕州市| 赞皇县| 北碚区| 德兴市| 高阳县| 霍城县| 滨海县| 汽车| 任丘市| 泗水县| 龙门县| 鹤山市| 卢氏县| 大关县| 昌吉市| 裕民县| 永登县| 沂南县| 邓州市| 吉隆县| 恭城| 许昌县|